Entries by

Finished my Capstone poster

The semester is coming to an end and there are only a few deadlines left but they are the most crucial. The poster being turned in this morning and next we present them at the SAGE Conference! After that the final Capstone paper is due and then it’s basically graduation day. I feel scared and excited […]

Here is my first graph

This graph shows the percentage of total trash capture devices that have been fitted with connector pipe screens. CPS inserts are installed in front of the catch basin’s outlet pipe – trapping trash and debris inside the catch basin while allowing filtered stormwater to exit into the storm drain infrastructure.